Accelerationism vs WASTED
Accelerationism (/ACC) and WASTED (WASTED) compared side by side.
Accelerationism (/ACC) and WASTED (WASTED) compared side by side.
/ACCWASTED
| Metric | /ACC | WASTED |
|---|---|---|
| Max drawdown (400d) | -49.6% | -99.9% |
| Risk-adjusted return (90d) | — | 0.00 |