accelerationist accelerationism vs WASTED
accelerationist accelerationism (ACC/ACC) and WASTED (WASTED) compared side by side.
accelerationist accelerationism (ACC/ACC) and WASTED (WASTED) compared side by side.
ACC/ACCWASTED
| Metric | ACC/ACC | WASTED |
|---|---|---|
| Max drawdown (400d) | -23.6% | -99.9% |
| Risk-adjusted return (90d) | — | 0.00 |