Pay With Quote vs WASTED
Pay With Quote (QUOTE) and WASTED (WASTED) compared side by side.
Pay With Quote (QUOTE) and WASTED (WASTED) compared side by side.
QUOTEWASTED
| Metric | QUOTE | WASTED |
|---|---|---|
| Max drawdown (400d) | -14.5% | -99.9% |
| Risk-adjusted return (90d) | — | 0.00 |